JobSnap vs Workyard: GPS Time Tracking for Construction Crews

JobSnap vs Workyard comes down to how each one reads location and what each one charges for. Workyard reconstructs a worker's day from GPS, across four plans from Starter to Enterprise. JobSnap works from the jobsite boundaries you draw, and puts scheduling, equipment, photos and estimates in one plan.

Competitor information is based on publicly available material and may change. Always confirm details and current pricing on the vendor's own site. We've tried to be fair: both products below are capable tools, and the right choice depends on your business.

JobSnap Workyard
Pricing structure $5 per active employee per month, $20 minimum. One plan, every feature included. Per-user monthly fee across Starter, Pro, Autopilot and Enterprise. Lowest rates billed annually, monthly also available; Enterprise priced by sales.
Free trial 30 days, no credit card. 14 days, no credit card.
GPS tracking Every punch is checked against your jobsite boundaries, using location during work hours only. Outside punches are flagged for review. On every plan: a breakdown of the sites a worker visited, built from GPS without setting up geofences.
Automatic clock in Included. A shift starts when a worker enters the jobsite and ends when they leave. On Autopilot and Enterprise. Pro adds arrival detection.
Scheduling Calendar, crew whiteboard, planner and time off, included. Scheduling and time off from Pro.
Job costing Labour and equipment hours per job, on the same daily timesheet. Labour cost by project, from Pro.
Equipment Included. Machine hours per job beside labour hours. Offered through Smart Forms, an add-on, with equipment templates.
QuickBooks Timesheet hours, plus customers, estimates and invoices with QuickBooks Online. Payroll export to QuickBooks. Accounting sync from Pro.

Two ways to read location

Workyard's Starter plan builds a summary of every address a worker visited and how long they stayed there, even if you never set up a geofence. The record follows the worker through the day.

JobSnap starts from the job. You give each jobsite a radius, or a custom boundary for a subdivision or a highway stretch, and every punch is matched to it. The result is hours per job, ready for the timesheet. When a crew moves between sites, the hours are split by job.

JobSnap uses location to start, stop and verify shifts during work hours, not around the clock. Workers see their own punches and hours in the app, so the record protects the honest ones too.

Where JobSnap fits

  • You want automatic punches without a top plan. On JobSnap, geofenced clock in and clock out comes with the single price.
  • You want one clock for the whole crew. Kiosk mode turns any phone or tablet into a shared time clock at the shop door or in the trailer. Leaving kiosk mode takes the manager's sign-in, so workers stay on the clock screen. No extra seats, no hardware.
  • You own machines. Equipment hours sit on the daily timesheet next to labour, with no add-on to buy.
  • You plan by crew. The whiteboard shows each crew, its foreman and its jobs, and a job can be split into blocks of dates for different crews.
  • You quote the work. Estimates and invoices and a jobsite camera are on the same jobs your crew punches into.
  • You work in French. JobSnap runs in English and French on iOS, Android and the web.

How to decide

Price both for your headcount. Workyard charges per user, and the rate depends on the plan that has the features you want. JobSnap costs a 6-person crew $30 a month with nothing left to unlock. Workyard's break and overtime rules are described in terms of state and federal law, so if you run crews in Canada, ask how it handles your province's rules, as you would with any tool. Then run a week of your own jobs through the live demo and compare.

Try JobSnap free for 30 days

$5 per employee per month, $20 minimum. Every feature included. No credit card to start.